a
Menu
0

800-523-2319experts@tasanet.com

Articles

Category: Construction

Construction Delays Analysis Methods

TASA ID: 2488

Construction projects often suffer from delays due to a wide variety of reasons, which can have severe financial impact on the project. As a result, delay claims may be filed. The analysis of the delay impact, the causes, and effects of the delaying activities is one of the most complicated types of claims analysis. It requires an expert with extensive knowledge of construction projects, means and methods, scheduling, and the ability to develop a sound methodology to conduct the analysis. Most of these delay claims reach the expert after completion of the project. This results in a detail- intensive research of the documents to verify schedules, events, sequence of work, changes during construction, and the delay impact.

Baby Injured by Hazardous Material on Stroller: How a Chemical Expert’s Detective Work Helped Solve the Mystery

TASA ID: 745

A young mother purchased a child stroller at a local mass merchandiser store in Indianapolis, Indiana, in early summer. Later that day she began walking with the baby in the stroller to bring her infant daughter to visit the child's grandparents about two miles away.  With the child safely strapped in the new stroller, she walked for about an hour, stopping twice to comfort her baby, who was crying and appearing uncomfortable.

RSS
First6263646567697071Last

Theme picker

Categories

Loading
  • Let Us Find Your Expert

  • Note: This form is to be completed by legal and insurance professionals ONLY. If you are a party in a case that requires an expert witness, please have your attorney contact TASA at 800-523-2319.

Search Experts

TASA provides a variety of quality, independent experts who meet your case criteria. Search our extensive list of experts now.

Search Experts
b